iCutter Industries has a rich history of delivering superior solutions for the smallest of drilling contractors to the largest of mining houses. The case studies below highlight our experience, safety record, and successful outcomes. True testimony of our capability to meet and exceed the quality and safety needs of our partners.

Case Study #1

Peabody Energy

Contract Duration: 3 years (present)
Safety Performance: 0 LTIs

Scope: This contract involved a scope identical to the current RFT in terms of deliverables

Outcomes

  • Increased production by over 20%
  • Achieved a cost reduction of $0.15 per metre.
Case Study #2

Action Drill & Blast

Contract Duration: 3 years (present)
Safety Performance: 0 LTIs

Scope: Supply and service of 30 drills

Outcomes

  • Achieved an approximate 10% increase in production.
Case Study #3

BHP Coal Mt Arthur

Contract Duration: 1 years (present)
Safety Performance: 0 LTIs

Scope: Supply cost per metre drill consumables to Mt Arthur Operations

Outcomes

  • Key Note is Increased
  • Penetration rates increased >20%
  • Now able to remove drill from fleet.
  • Saved AUD 5M p.a. by removing drill from operation
Case Study #4

BHP Nickel West Mt Keith

Contract Duration: 1 years (present)
Safety Performance: 0 LTIs

Scope: Supply and implementation of the HRX System to enhance drilling productivity at Mt Keith operations.

Outcomes

  • Achieved a 43% to 68.5% increase in production rates across transitional and hard geology.
  • Total drilling costs reduced by 21.5%.
  • Increased drill fleet capacity by 30%, eliminating the need for two additional drill units.
  • Faster, smoother drilling with improved collaring and hole straightness.